    Dear TRIUMF Users, Experimenters, Operators and Personnel, <br>
    <br>
    <font face="Baskerville">The Final Beam Schedule (for ISAC and BL2C)
      for spring 2011 (Beam Schedule 119a) is now posted
      on the web at <a
        href="https://mis.triumf.ca/science/schedules.jsf">https://mis.triumf.ca/science/schedules.jsf</a>
      under "Actual Schedules". <br>
      <br>
      Schedule 119 is being split in two parts - Schedule 119a (April
      1st - May 31st) and Schedule 119b (June 1st - September 22nd). <i>Please
        note that Schedule 119b is under "Drafts" on the same page and
        will be updated in the next couple of weeks.</i></font><br>
    <br>
    For BL1A (hence all M-channels) there is, at present, some
    uncertainty with respect to start of operation, due to beam line
    installation and vacuum issues. It is presently possible that we
    will only start operation of BL1A ~August 10th, 2011. Because of
    this we are considering the option of <b>not</b> having a
    mini-shutdown in September. When this is known, we will iterate it
    in Schedule 119b. <font face="Baskerville"><i><br>
        <br>
      </i>If you are scheduled on Schedule 119a, please go ahead and
      book your travel and make your TRIUMF House reservations. If you
      are listed on Schedule 119b, please hold off on booking your
      travel and making your TRIUMF House reservations until the
      schedule has been finalized.<br>
      <br>
      Please
      note that if you have beam time on Schedule 119a (and 119b when it
      is finalized), the Science Division
      will need your Safety Report <b>*two weeks*</b> before the
      experiment
      is
      scheduled to run. Safety Reports should be submitted to
      <a class="moz-txt-link-abbreviated"
        href="mailto:sciencediv@triumf.ca">sciencediv@triumf.ca</a>. If
      a spokesperson(s) or safety coordinator fails
      to hand in (or email) the Safety Report before the two week
      deadline,
      then the beam time allocated to their experiment will not be
      guaranteed.</font><br>
    <br>
    Regards and thanks for your patience, <br>
    Niki Martin<br>
    for Jens Dilling <br>
    <pre class="moz-signature" cols="72">-- 
Miss Nicole (Niki) Martin
Administrative Assistant
Science Division

TRIUMF
Accelerating Science for Canada | Un acc&eacute;l&eacute;rateur de la d&eacute;marche scientifique canadienne
4004 Wesbrook Mall
Vancouver, BC  V6T 2A3
604-222-7438</pre>