<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
<meta http-equiv="content-type" content="text/html;
charset=ISO-8859-1">
</head>
<body bgcolor="#ffffff" text="#000000">
Dear TRIUMF Users, Experimenters, Operators and Staff, <br>
<br>
<font face="Baskerville">The <b>Draft</b> Beam Schedule for summer
2011 (Beam Schedule 119b) is now posted on the web at <a
href="https://mis.triumf.ca/science/schedules.jsf">https://mis.triumf.ca/science/schedules.jsf</a>
under "Drafts".</font><font face="Baskerville"><br>
<br>
Please note that if you have beam time on Schedule 119b, the
Science Division will need your Safety Report <b>*two weeks*</b>
before the experiment is scheduled to run. Safety Reports should
be submitted to <a class="moz-txt-link-abbreviated"
href="mailto:sciencediv@triumf.ca">sciencediv@triumf.ca</a>. If
a spokesperson(s) or safety coordinator fails to hand in (or
email) the Safety Report before the two week deadline, then the
beam time allocated to their experiment will not be guaranteed.</font><br>
<br>
Regards and thanks for your patience, <br>
Niki Martin<br>
for Jens Dilling <br>
<pre class="moz-signature" cols="72">--
Miss Nicole (Niki) Martin
Administrative Assistant
Science Division
TRIUMF
Accelerating Science for Canada | Un accélérateur de la démarche scientifique canadienne
4004 Wesbrook Mall
Vancouver, BC V6T 2A3
604-222-7438</pre>
</body>
</html>