<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
  </head>
  <body bgcolor="#FFFFFF" text="#000000">
    Dear TRIUMF Users, Experimenters, Operators and Staff,
    <br>
    <o:p>&nbsp;</o:p> <br>
    Due to reoccurring vacuum leak problems at the BL1A T2-M9 interface,
    a decision has been made in collaboration between the Accelerator
    Division and the Science Division, to blank-off this beamline. The
    vacuum leak, caused by an indium seal, is at this point no longer
    sustainable in terms of operation, even though we have added
    substantial pumping over the long weekend. <br>
    <br>
    The blank-off procedure will commence today during the maintenance
    day and is scheduled to be finished <st1:date year="2012" day="24"
      month="10">October 24th, 2012</st1:date>. Beam is expected
    restored back to the beamline on <st1:date year="2012" day="25"
      month="10">October 25th, 2012</st1:date>. <br>
    <br>
    This blank-off has a number of consequences: <br>
    <ul>
      <li><span style="font-family:Symbol;
          mso-fareast-font-family:Symbol;mso-bidi-font-family:Symbol"><span
            style="mso-list:Ignore"><span style="font:7.0pt &quot;Times
              New Roman&quot;"></span></span></span>During the blank-off
        procedure there will be no beam to BL1A (hence no experiments
        will be running on M9, M11, M13, M15, and M20, as well as
        PIF/NIF) </li>
      <li><span style="font-family:Symbol;
          mso-fareast-font-family:Symbol;mso-bidi-font-family:Symbol"><span
            style="mso-list:Ignore"><span style="font:7.0pt &quot;Times
              New Roman&quot;"></span></span></span>After the blank-off
        there will be no beam available for experiments on M9. </li>
      <li>The on-line Schedule 123 will reflect the time when no beam is
        expected, and will continue with already scheduled activities
        once beam is back. </li>
    </ul>
    <o:p></o:p>Due to this interruption of beam delivery to BL1A we are
    considering an extension of the high intensity operation, which is
    currently scheduled to end <st1:date year="2012" day="4" month="12">Dec
      4 2012</st1:date>. We have to evaluate the impact on the shut down
    schedule as well on effected users, before a final decision is made.
    <br>
    <o:p>&nbsp;</o:p> <br>
    I apologize for this interruption and please feel free to contact me
    for further details or if you have questions <br>
    <o:p>&nbsp;</o:p> <br>
    Jens Dilling<br>
    <pre class="moz-signature" cols="72">-- 
*********************************************
Dr. Jens Dilling
Head Nuclear Physics/ISAC  TRIUMF
Physics &amp; Astronomy University of BC
Tel/Fax 1 604 222 7413/1074
<a class="moz-txt-link-abbreviated" href="mailto:JDilling@triumf.ca">JDilling@triumf.ca</a>
<a class="moz-txt-link-abbreviated" href="http://www.triumf.ca/titan">www.triumf.ca/titan</a>
*********************************************
</pre>
  </body>
</html>